Primary H1: Section 106 Sewer Connections & Adoptable Drainage
Core H2s: Who We Work With for Section 106 Sewer Connections; What We Deliver on Section 106 Drainage Schemes; Key Outputs & Deliverables; Our 5-Stage Delivery Process; Why R W Services for Section 106 Sewer Connections; Frequently Asked Questions; Book a Section 106 Drainage Package Review
Midlands-based civil engineering and highways contractor delivering fully managed Section 106 sewer connections, adoptable drainage and off-site sewer works – coordinated with local authorities, water companies and your build programme.
Typical clients: regional and national housebuilders, developers, principal contractors, consulting engineers and utility coordinators seeking a practical, compliant delivery partner.
Typical response within one working day with programme-aware advice and budget guidance.
Section 106 sewer connections sit at the intersection of design compliance, utility approvals and live-site constraints. When they are not managed proactively, they quickly become a critical path risk – impacting road openings, plot handovers and adoption sign-off.
R W Services provides an end-to-end delivery partner for Section 106 sewer connections and adoptable drainage across the Midlands and wider UK. From early-stage buildability input and value engineering, through to permits, traffic management and final connection, we keep your drainage works aligned with programme, technical approvals and safety standards.
Our teams are used to working under the scrutiny of local authorities, water companies and client-side technical advisors. We understand the need for tidy records, clear communication and a realistic view on what is buildable within live highways and constrained sites.
R W Services supports a wide range of stakeholders involved in planning, designing and delivering Section 106 drainage works. Our role is to de-risk delivery, keep you compliant and protect your critical paths.
We integrate Section 106 works into your overall infrastructure programme – sequencing drainage, roads and utilities to minimise disruption and avoid rework at road opening or adoption stages.
We act as a specialist subcontractor for drainage and Section 106 works – managing permits, traffic management and water company coordination while aligning with your site logistics and safety systems.
We provide buildability feedback, costed options and practical advice around access, phasing and temporary works – helping you refine drainage strategies and submission packages before they hit site.
We engage early on traffic management, road-opening notices and working windows, presenting clear method statements and phasing plans to minimise disruption and maintain compliance.
For clients with multiple sites, we build standardised approaches to Section 106 drainage – consistent details, documentation and reporting that make portfolio and framework management easier.
Our teams deliver the complete on-site scope for Section 106 sewer connections and adoptable drainage, from excavation to final reinstatement. We build to current standards, coordinate with third parties and keep thorough records to support adoption and technical sign-off.
We plan Section 106 works around your critical dates – show home openings, road adoption milestones, utility go-lives and plot handovers – while maintaining safety and compliance with:
We recognise that your role often depends on being able to demonstrate compliance and provide clear, auditable records. Our Section 106 drainage service is built around producing the outputs your stakeholders expect to see.
A clear process keeps sites safe, interfaces managed and approvals on track. We follow a structured 5-stage approach for all Section 106 drainage projects.
We review your drainage layouts, Section 106 agreements and any utility/authority correspondence. We flag buildability issues, access constraints, diversion requirements and programme risks before you commit to final details.
We prepare programmes, method statements and permit applications as required, coordinating with water companies, local authorities and any affected third parties. Traffic management, over-pumping and temporary works are planned into the sequence from the outset.
Our experienced supervisors manage excavation, installation, connections and reinstatement – coordinating with your site team and other contractors. Safety, temporary works and service protection are managed in line with agreed RAMS and client expectations.
We arrange or support pressure testing, CCTV surveys and inspections in line with water company and local authority requirements. Any defects are addressed promptly to avoid delays to adoption or road opening.
You receive a clear package of as-built records, test results and photographic evidence. We remain available to support any follow-up queries from water companies, local authorities or internal technical teams, and to undertake remedial works where required.
You need a contractor who understands the paperwork, the standards and the realities of delivery in live environments. Our teams bring practical experience across highways, infrastructure and drainage schemes throughout the Midlands and beyond.
We combine civil engineering, highways and drainage expertise, so Section 106 works are delivered with full awareness of road construction, utilities, street works and safety requirements.
From RAMS, ITPs and temporary works through to as-builts and test records, we produce the documentation your technical teams, auditors and adopting authorities expect to see.
We understand developer and main contractor programmes – critical dates, long-lead approvals and budget constraints – and we communicate early if risk or change is emerging on site.
As a regional contractor, you deal directly with senior operational leaders who can make decisions quickly – ideal when approvals shift, scope changes or uncharted services are uncovered on site.
If you cannot see your question answered here, please include it with your enquiry and we will respond with project-specific advice.
R W Services is based in the Midlands and regularly delivers Section 106 sewer connections and drainage schemes across the wider Midlands region and neighbouring areas. For larger or framework-led projects, we can support schemes further afield by agreement. Share your site location with your enquiry and we will confirm coverage and indicative lead times.
Ideally, we like to be involved once you have outline drainage proposals and early engagement with the water company or adopting authority. At that point we can provide buildability input, flag any access or temporary works issues, and help shape programmes and budgets. However, we also regularly pick up schemes later in the process where Section 106 approvals are already in place and you need a delivery partner.
Yes. While the legal Section 106 agreement is typically between you and the adopting authority or water company, we can support the technical aspects – including advising on details, method statements, traffic management and phasing information needed to secure approval or book connection dates.
We normally work from client, consultant or water company-approved designs. However, we can support value engineering and buildability reviews, and we work closely with design partners where minor design adjustments or temporary works designs are required.
We either provide traffic management directly or coordinate with approved traffic management partners, depending on the local authority and road category. We plan traffic management, permits and road openings into the programme from the outset, allowing for lead times, working windows and any special conditions attached to the permit.
Typically we request: current drainage drawings (including long sections where available), any Section 106 agreements or water company correspondence, outline programmes or key dates, any known constraints (e.g. restricted working hours, sensitive receptors) and a description of interfaces with other contractors. The more information you can provide at enquiry stage, the more accurate and robust our proposal will be.
Yes. We can operate either as principal contractor or as a specialist subcontractor within a wider project, depending on the structure of your scheme and your internal preferences. Our health, safety and environmental systems are set up to meet client and regulatory requirements under either arrangement.
Where drainage failures or urgent connection issues arise, we can mobilise at short notice subject to permits and access. We will give you an honest assessment of what is achievable within the constraints of approvals, traffic management and safety, and then prioritise actions that protect people, property and service continuity.
If you have drawings or a live Section 106 proposal, we can normally provide initial feedback within one working day and a budget cost soon after, subject to information.
We are happy to work under your NDAs or framework agreements where required.
R W Services operates with robust health, safety, quality and environmental systems, aligned to client, local authority and water company expectations.
CHAS / SafeContractor (or equivalent SSIP schemes)
Street works & traffic management competencies
CSCS / CPCS / NPORS qualified operatives
Water company & local authority-approved methods
Formal accreditation lists can be provided on request with your pre-qualification or framework documentation.
Share your drawings, outline scope and key programme dates, and we will come back with practical, commercially grounded options for delivering your Section 106 sewer connections and adoptable drainage.
Ideal for:
Share a brief description of the scheme, your drawings and key dates. We will review and come back with practical options, outline costs and any immediate risks we can see.
Prefer to talk it through first? Include your mobile number and a suitable time window and we will schedule a call.
Data protection & GDPR
By submitting this form you consent to R W Services storing and processing your details for the purpose of responding to your enquiry. We will not share your information with third parties other than where required to price or deliver your project (for example, specialist surveys or traffic management), and always in line with our privacy policy.
Please tick the GDPR consent box in the form to confirm you are happy for us to contact you about this enquiry.

294 Aldridge Road
Streetly
West Midlands
B74 2DU
Accreditations: ISO 9001 | ISO 14001 | ISO 45001 | NHSS | Constructionline Gold | CHAS Elite | SSIP
© 2026 R W Services. All rights reserved.