
New build developments
Estate Roads
Footways
Drainage
Off site highway tie-ins






"We have always been pleased with their high standards and professionalism"
"We find RWS very easy to deal with from the upfront quoting to helping with relevant permits & agreements"





Residential infrastructure requires careful coordination between approved designs, construction programmes, utility installations, local authority requirements and the activities of other contractors.
Our experienced management and delivery teams understand these interfaces and work proactively to keep infrastructure moving while maintaining quality and compliance.
Housing infrastructure encompasses the roads, drainage, footways and associated civil engineering works required to transform a development site into a safe, accessible and functional residential community.
This commonly includes Section 278 highway improvements connecting the development to the existing highway network and Section 38 estate roads intended for adoption by the local highway authority.
Successful delivery requires more than constructing individual elements.
Drainage levels must coordinate with road construction. Kerb lines must align with approved highway geometry. Utility installations must be considered within the programme. Construction quality must be maintained throughout so that infrastructure can ultimately satisfy inspection and adoption requirements.
R W Services provides an integrated approach, allowing developers to appoint an experienced highway contractor capable of delivering multiple elements of the infrastructure package.

Highway construction is a core part of our business, giving clients access to teams experienced in both adoptable and private infrastructure.

We understand the requirements associated with constructing highway infrastructure under Section 278 and Section 38 Agreements.

Drainage, kerbing, roads, footways, surfacing and road markings can be coordinated through a single contractor.

We construct infrastructure with final inspection and adoption requirements in mind from the outset.

Our teams work alongside developers and other contractors to coordinate infrastructure around the wider development programme.

Established delivery capability across Birmingham, the Black Country, Coventry, Warwickshire and the wider Midlands.
Complete Housing Infrastructure Packages
Section 278 Works - New development accesses, junction improvements, highway widening, traffic islands, crossings and associated works to the existing public highway.
Section 38 Estate Roads - Construction of new estate roads intended for adoption by the highway authority.
Estate Road Construction – Complete pavement construction from formation and sub-base through to asphalt surfacing.
Highway Drainage – Gullies, carrier drains, manholes, catchpits and associated surface water infrastructure.
Kerbing & Edging – Kerbs, channels, edgings and associated concrete works
Footways & Cycleways – Construction of pedestrian and cycle infrastructure throughout residential developments.
Asphalt Surfacing – Base, binder and surface course installation for estate roads, access roads and associated areas.
Traffic Calming Features – Raised tables, speed cushions and other approved traffic-calming measures.
Road Markings – In-house thermoplastic markings for completed roads and junctions.
Street Furniture Civils – Foundations and associated civil works for signs, bollards and other highway infrastructure.
We review approved drawings, specifications, Section 278/38 requirements, programme constraints and interfaces.
Construction sequencing is developed around utilities, housebuilding operations, access requirements and other contractors.
Our teams construct drainage, roads, kerbing, footways and associated civil engineering works to the approved specification.
Works are inspected throughout construction with quality records maintained to support compliance and adoption.
Final surfacing, markings and remedial works are completed with relevant records provided to support inspection and adoption.
• National Housebuilders
• Regional Housebuilders
• Residential Developers
• Strategic Land Developers
• Principal Contractors
• Civil Engineering Contractors
• Housing Associations
• Local Authorities
Whether supporting a single residential development or forming part of a longer-term delivery programme, we provide the same focus on safety, quality and reliable delivery.
Poor coordination or construction quality during infrastructure works can result in costly remedial works, programme delays and difficulties achieving adoption.
We reduce these risks by:
Reviewing drawings and specifications before construction
Identifying buildability issues early
Coordinating works with utilities and other trades
Maintaining accurate construction levels
Applying robust inspection and quality-control procedures
Constructing to approved highway specifications
Maintaining quality records throughout delivery
Planning works around the wider development programme
Managing interfaces between S278, S38 and internal infrastructure
Addressing defects promptly before they affect subsequent works
Our approach is designed to give developers confidence that infrastructure is being constructed correctly from the outset.
A delivery-focused partner used to working in and around live residential developments, with the paperwork and practicalities covered.
We understand housing layouts, plot handovers and the commercial drivers behind your programme, so our sequencing and delivery reflect what your teams need on the ground.
We are comfortable talking detail with your engineers and local authorities, but we also understand what is workable for site teams and residents day to day.
Based in the Midlands, we are well placed to support schemes across the region and neighbouring counties, with teams used to multi-site frameworks and repeat work.
Robust RAMS, accredited operatives and consistent supervision mean your S278 and S38 works are delivered safely, with the records you need for audit and adoption.
Answers to common questions from housebuilders, developers and principal contractors about our S278 and S38 services.
Yes. We specialise in Section 278 highway works including development accesses, junction improvements, highway widening, pedestrian infrastructure and associated drainage.
Yes. We construct estate roads intended for adoption in accordance with approved drawings and local highway authority specifications.
Yes. We can deliver drainage, kerbing, pavement construction, footways, asphalt surfacing and final road markings.
Yes. We work for housebuilders, developers and principal contractors across residential developments throughout the Midlands.
Potentially, yes. We can review the condition and available construction records for existing works and determine what is required to progress or complete the infrastructure.
Yes. We can undertake remedial works identified during highway inspections and adoption processes.
Our core area includes Birmingham, the Black Country, Coventry, Warwickshire and the wider Midlands.
For a detailed quotation we typically require: location plan, general arrangement drawings, construction details, specification, any available ground investigation, anticipated start and completion dates, known constraints, and whether night or weekend working may be required. Uploading your drawings and notes via the enquiry form is the quickest way to start.
From development access works and Section 38 roads through to drainage, surfacing and final road markings, R W Services provides the highway expertise needed to deliver residential infrastructure safely and efficiently.
Get clear, practical advice and a reliable delivery partner for your highways and infrastructure works
Meta title: Housing Infrastructure Contractor | S278 & S38 Works for Housebuilders | R W Services
Meta description: R W Services is a Midlands-based civil engineering and highways contractor delivering housing infrastructure, Section 278 and Section 38 works for housebuilders, developers and principal contractors. Practical, adoptable roads, drainage and off-site highway connections, from early review to final sign-off.
URL slug: /services/housing-infrastructure-s278-s38
H1: Housing infrastructure delivery for S278 & S38 schemes that "just get signed off"
Primary H2s: Practical S278 & S38 delivery for live housing sites; Who we help; What we deliver on housing infrastructure schemes; Key outputs and deliverables; 5-stage delivery process; Why R W Services for housing infrastructure; Housing infrastructure (S278 & S38) FAQs; Accreditations & assurances; Request a housing infrastructure proposal.

294 Aldridge Road
Streetly
West Midlands
B74 2DU
Accreditations: ISO 9001 | ISO 14001 | ISO 45001 | NHSS | Constructionline Gold | CHAS Elite | SSIP
© 2026 R W Services. All rights reserved.